{"id":1446,"date":"2023-05-25T10:17:19","date_gmt":"2023-05-25T01:17:19","guid":{"rendered":"https:\/\/www.nissin-ion.co.jp\/en\/?p=1446"},"modified":"2023-05-25T10:52:12","modified_gmt":"2023-05-25T01:52:12","slug":"notice-of-completion-of-new-plant","status":"publish","type":"post","link":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/","title":{"rendered":"Notice of Completion of New Plant"},"content":{"rendered":"\n<p>We are pleased to announce that our company has completed the construction of a new factory at our Shiga facility, which began in August 2022, in order to effectively meet the increasing customer demand resulting from the expansion of the semiconductor and flat panel display markets. The new factory was completed on May 16, 2023.<br><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"408\" src=\"https:\/\/www.nissin-ion.co.jp\/en\/wp-content\/uploads\/2023\/05\/e6a95350774e5b7e8f808395e0c750a9.jpg\" alt=\"\" class=\"wp-image-1422\"\/><\/figure>\n\n\n\n<p>\u3010Overview of the New Factory\u3011<br>\u3000Location: 29 Hinoki-gaoka, Minaguchi-cho, Koka-City, Shiga Prefecture<br>\u3000Building outline: Steel-framed, single-story<br>\u3000Floor Area: Approximately 3,145 square meters<\/p>\n\n\n\n<p>Thank you for your attention.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We are pleased to announce that our company has completed the construction of a new factory at our Shiga facility, which began in August 2022, in order to effectively meet the increasing customer demand resulting from the expansion of the semiconductor and flat panel display markets. The new factory was completed on May 16, 2023. \u3010Overview of the New Factory\u3011\u3000Location: 29 Hinoki-gaoka, Minaguchi-cho, Koka-City, Shiga Prefecture\u3000Building outline: Steel-framed, single-story\u3000Floor Area: Approximately 3,145 square meters Thank you for your attention.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1446","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"We are pleased to announce that our company has completed the construction of a new factory at our Shiga facility, which began in August 2022, in order to effectively meet the increasing customer demand resulting from the expansion of the semiconductor and flat panel display markets. The new factory was completed on May 16, 2023.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"admin@nissin\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Nissin Ion Equipment Co., Ltd. - \u300cWe find great pleasure and pride in carrying out our business by contributing to our customer&#039;s success, concentrating on the technology used in our ion implanters used for semi-conductor and display production as well as proposing a variety of solutions through our tools, technology and services as a worldwide leading maker.\u300d\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Notice of Completion of New Plant - Nissin Ion Equipment Co., Ltd.\" \/>\n\t\t<meta property=\"og:description\" content=\"We are pleased to announce that our company has completed the construction of a new factory at our Shiga facility, which began in August 2022, in order to effectively meet the increasing customer demand resulting from the expansion of the semiconductor and flat panel display markets. The new factory was completed on May 16, 2023.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-05-25T01:17:19+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-05-25T01:52:12+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Notice of Completion of New Plant - Nissin Ion Equipment Co., Ltd.\" \/>\n\t\t<meta name=\"twitter:description\" content=\"We are pleased to announce that our company has completed the construction of a new factory at our Shiga facility, which began in August 2022, in order to effectively meet the increasing customer demand resulting from the expansion of the semiconductor and flat panel display markets. The new factory was completed on May 16, 2023.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.nissin-ion.co.jp\/en\/wp-content\/uploads\/2022\/07\/nissinion_OGP.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/notice-of-completion-of-new-plant\\\/#blogposting\",\"name\":\"Notice of Completion of New Plant - Nissin Ion Equipment Co., Ltd.\",\"headline\":\"Notice of Completion of New Plant\",\"author\":{\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/author\\\/adminnissin\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/e6a95350774e5b7e8f808395e0c750a9.jpg\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/notice-of-completion-of-new-plant\\\/#articleImage\",\"width\":612,\"height\":408},\"datePublished\":\"2023-05-25T10:17:19+09:00\",\"dateModified\":\"2023-05-25T10:52:12+09:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/notice-of-completion-of-new-plant\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/notice-of-completion-of-new-plant\\\/#webpage\"},\"articleSection\":\"News\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/notice-of-completion-of-new-plant\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en#listItem\",\"position\":1,\"name\":\"\\u30db\\u30fc\\u30e0\",\"item\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/#listItem\",\"name\":\"Events and News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/#listItem\",\"position\":2,\"name\":\"Events and News\",\"item\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/#listItem\",\"name\":\"News\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en#listItem\",\"name\":\"\\u30db\\u30fc\\u30e0\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/#listItem\",\"position\":3,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/notice-of-completion-of-new-plant\\\/#listItem\",\"name\":\"Notice of Completion of New Plant\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/#listItem\",\"name\":\"Events and News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/notice-of-completion-of-new-plant\\\/#listItem\",\"position\":4,\"name\":\"Notice of Completion of New Plant\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/#listItem\",\"name\":\"News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/#organization\",\"name\":\"\\u65e5\\u65b0\\u30a4\\u30aa\\u30f3\\u6a5f\\u5668\\u682a\\u5f0f\\u4f1a\\u793e\",\"description\":\"\\u300cWe find great pleasure and pride in carrying out our business by contributing to our customer's success, concentrating on the technology used in our ion implanters used for semi-conductor and display production as well as proposing a variety of solutions through our tools, technology and services as a worldwide leading maker.\\u300d\",\"url\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/author\\\/adminnissin\\\/#author\",\"url\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/author\\\/adminnissin\\\/\",\"name\":\"admin@nissin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/notice-of-completion-of-new-plant\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0cfbac2143375704f459783521a0fece?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"admin@nissin\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/notice-of-completion-of-new-plant\\\/#webpage\",\"url\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/notice-of-completion-of-new-plant\\\/\",\"name\":\"Notice of Completion of New Plant - Nissin Ion Equipment Co., Ltd.\",\"description\":\"We are pleased to announce that our company has completed the construction of a new factory at our Shiga facility, which began in August 2022, in order to effectively meet the increasing customer demand resulting from the expansion of the semiconductor and flat panel display markets. The new factory was completed on May 16, 2023.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/event-news\\\/news\\\/notice-of-completion-of-new-plant\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/author\\\/adminnissin\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/author\\\/adminnissin\\\/#author\"},\"datePublished\":\"2023-05-25T10:17:19+09:00\",\"dateModified\":\"2023-05-25T10:52:12+09:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/\",\"name\":\"Nissin Ion Equipment Co., Ltd.\",\"description\":\"\\u300cWe find great pleasure and pride in carrying out our business by contributing to our customer's success, concentrating on the technology used in our ion implanters used for semi-conductor and display production as well as proposing a variety of solutions through our tools, technology and services as a worldwide leading maker.\\u300d\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.nissin-ion.co.jp\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Notice of Completion of New Plant - Nissin Ion Equipment Co., Ltd.","description":"We are pleased to announce that our company has completed the construction of a new factory at our Shiga facility, which began in August 2022, in order to effectively meet the increasing customer demand resulting from the expansion of the semiconductor and flat panel display markets. The new factory was completed on May 16, 2023.","canonical_url":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/#blogposting","name":"Notice of Completion of New Plant - Nissin Ion Equipment Co., Ltd.","headline":"Notice of Completion of New Plant","author":{"@id":"https:\/\/www.nissin-ion.co.jp\/en\/author\/adminnissin\/#author"},"publisher":{"@id":"https:\/\/www.nissin-ion.co.jp\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.nissin-ion.co.jp\/en\/wp-content\/uploads\/2023\/05\/e6a95350774e5b7e8f808395e0c750a9.jpg","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/#articleImage","width":612,"height":408},"datePublished":"2023-05-25T10:17:19+09:00","dateModified":"2023-05-25T10:52:12+09:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/#webpage"},"isPartOf":{"@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/#webpage"},"articleSection":"News"},{"@type":"BreadcrumbList","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.nissin-ion.co.jp\/en#listItem","position":1,"name":"\u30db\u30fc\u30e0","item":"https:\/\/www.nissin-ion.co.jp\/en","nextItem":{"@type":"ListItem","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/#listItem","name":"Events and News"}},{"@type":"ListItem","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/#listItem","position":2,"name":"Events and News","item":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/#listItem","name":"News"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.nissin-ion.co.jp\/en#listItem","name":"\u30db\u30fc\u30e0"}},{"@type":"ListItem","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/#listItem","position":3,"name":"News","item":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/#listItem","name":"Notice of Completion of New Plant"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/#listItem","name":"Events and News"}},{"@type":"ListItem","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/#listItem","position":4,"name":"Notice of Completion of New Plant","previousItem":{"@type":"ListItem","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/#listItem","name":"News"}}]},{"@type":"Organization","@id":"https:\/\/www.nissin-ion.co.jp\/en\/#organization","name":"\u65e5\u65b0\u30a4\u30aa\u30f3\u6a5f\u5668\u682a\u5f0f\u4f1a\u793e","description":"\u300cWe find great pleasure and pride in carrying out our business by contributing to our customer's success, concentrating on the technology used in our ion implanters used for semi-conductor and display production as well as proposing a variety of solutions through our tools, technology and services as a worldwide leading maker.\u300d","url":"https:\/\/www.nissin-ion.co.jp\/en\/"},{"@type":"Person","@id":"https:\/\/www.nissin-ion.co.jp\/en\/author\/adminnissin\/#author","url":"https:\/\/www.nissin-ion.co.jp\/en\/author\/adminnissin\/","name":"admin@nissin","image":{"@type":"ImageObject","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/0cfbac2143375704f459783521a0fece?s=96&d=mm&r=g","width":96,"height":96,"caption":"admin@nissin"}},{"@type":"WebPage","@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/#webpage","url":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/","name":"Notice of Completion of New Plant - Nissin Ion Equipment Co., Ltd.","description":"We are pleased to announce that our company has completed the construction of a new factory at our Shiga facility, which began in August 2022, in order to effectively meet the increasing customer demand resulting from the expansion of the semiconductor and flat panel display markets. The new factory was completed on May 16, 2023.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.nissin-ion.co.jp\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/#breadcrumblist"},"author":{"@id":"https:\/\/www.nissin-ion.co.jp\/en\/author\/adminnissin\/#author"},"creator":{"@id":"https:\/\/www.nissin-ion.co.jp\/en\/author\/adminnissin\/#author"},"datePublished":"2023-05-25T10:17:19+09:00","dateModified":"2023-05-25T10:52:12+09:00"},{"@type":"WebSite","@id":"https:\/\/www.nissin-ion.co.jp\/en\/#website","url":"https:\/\/www.nissin-ion.co.jp\/en\/","name":"Nissin Ion Equipment Co., Ltd.","description":"\u300cWe find great pleasure and pride in carrying out our business by contributing to our customer's success, concentrating on the technology used in our ion implanters used for semi-conductor and display production as well as proposing a variety of solutions through our tools, technology and services as a worldwide leading maker.\u300d","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.nissin-ion.co.jp\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Nissin Ion Equipment Co., Ltd. - \u300cWe find great pleasure and pride in carrying out our business by contributing to our customer's success, concentrating on the technology used in our ion implanters used for semi-conductor and display production as well as proposing a variety of solutions through our tools, technology and services as a worldwide leading maker.\u300d","og:type":"article","og:title":"Notice of Completion of New Plant - Nissin Ion Equipment Co., Ltd.","og:description":"We are pleased to announce that our company has completed the construction of a new factory at our Shiga facility, which began in August 2022, in order to effectively meet the increasing customer demand resulting from the expansion of the semiconductor and flat panel display markets. The new factory was completed on May 16, 2023.","og:url":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/","article:published_time":"2023-05-25T01:17:19+00:00","article:modified_time":"2023-05-25T01:52:12+00:00","twitter:card":"summary_large_image","twitter:title":"Notice of Completion of New Plant - Nissin Ion Equipment Co., Ltd.","twitter:description":"We are pleased to announce that our company has completed the construction of a new factory at our Shiga facility, which began in August 2022, in order to effectively meet the increasing customer demand resulting from the expansion of the semiconductor and flat panel display markets. The new factory was completed on May 16, 2023.","twitter:image":"https:\/\/www.nissin-ion.co.jp\/en\/wp-content\/uploads\/2022\/07\/nissinion_OGP.jpg"},"aioseo_meta_data":{"post_id":"1446","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2023-05-25 01:17:22","updated":"2025-06-11 18:33:49","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.nissin-ion.co.jp\/en\" title=\"\u30db\u30fc\u30e0\">\u30db\u30fc\u30e0<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/\" title=\"Events and News\">Events and News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tNotice of Completion of New Plant\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"\u30db\u30fc\u30e0","link":"https:\/\/www.nissin-ion.co.jp\/en"},{"label":"Events and News","link":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/"},{"label":"News","link":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/"},{"label":"Notice of Completion of New Plant","link":"https:\/\/www.nissin-ion.co.jp\/en\/event-news\/news\/notice-of-completion-of-new-plant\/"}],"_links":{"self":[{"href":"https:\/\/www.nissin-ion.co.jp\/en\/wp-json\/wp\/v2\/posts\/1446"}],"collection":[{"href":"https:\/\/www.nissin-ion.co.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nissin-ion.co.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nissin-ion.co.jp\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nissin-ion.co.jp\/en\/wp-json\/wp\/v2\/comments?post=1446"}],"version-history":[{"count":2,"href":"https:\/\/www.nissin-ion.co.jp\/en\/wp-json\/wp\/v2\/posts\/1446\/revisions"}],"predecessor-version":[{"id":1449,"href":"https:\/\/www.nissin-ion.co.jp\/en\/wp-json\/wp\/v2\/posts\/1446\/revisions\/1449"}],"wp:attachment":[{"href":"https:\/\/www.nissin-ion.co.jp\/en\/wp-json\/wp\/v2\/media?parent=1446"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nissin-ion.co.jp\/en\/wp-json\/wp\/v2\/categories?post=1446"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nissin-ion.co.jp\/en\/wp-json\/wp\/v2\/tags?post=1446"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}